We are thrilled to be taking another significant step with the new building… the crane has lowered the precast concrete flooring into place that will allow us to continue building the walls on the next level!

Crane Lowering Spans
Crane Lowering Spans

As God continues to provide good weather for construction, we are hoping to put down the tubing for the in-floor heat on the second level, so that early in the week of September 26th, we can pour the floor on the second level!

Thank you for your prayers!  God continues to bless us with incredible weather, funding for construction, and safety!  Lord willing, we still hope to have the building totally enclosed by Christmas!